Home Patent Forecast® Sectors Log In   Contact  
How it works Patent Forecast® Sectors Insights
Menu
Enjoy your FREE PREVIEW which shows only 2022 data and 25 documents. Contact Patent Forecast for full access.        

Energy Financial Settlements

Search All Patents in Energy Financial Settlements


Patent US10719098


Issued 2020-07-21

System And Method For On-demand Electrical Power

A system for providing on-demand renewable energy. The system includes at least one power unit for converting environmental energy into electrical power; a global positioning system (GPS) unit that provides current location coordinates for the system; and a regulator for controlling an amount of the electrical power drawn from the at least one power unit based on a first authorization rule and at least one second authorization rule, wherein the first authorization rule is a misuse event requirement for detecting that the current location coordinates indicate that the system has not been moved from an authorized location; wherein the system is independent from any grid and is initially installed at the authorized location; wherein failure to meet the misuse event requirement results in a denial of supply of electrical power by the regulator; and wherein the at least one second authorization rule is a purchase requirement.



Much More than Average Length Specification


View the Patent Matrix® Diagram to Explore the Claim Relationships

USPTO Full Text Publication >

1 Independent Claim

  • 1. A system for providing on-demand renewable energy, comprising: at least one power unit for converting environmental energy into electrical power, wherein the electrical power is drawn from the at least one power unit; a global positioning system (GPS) unit that provides current location coordinates for the system; and a regulator for controlling an amount of the electrical power drawn from the at least one power unit based on a plurality of authorization rules including a first authorization rule and at least one second authorization rule, wherein at least the first authorization rule is checked any of periodically and upon each attempt to draw the electrical power from the at least one power unit, wherein the first authorization rule is a misuse event requirement for detecting that the current location coordinates indicate that the system has not been moved from an authorized location; wherein the system is independent from any grid in that it is not connected to any grid and is initially installed at the authorized location; wherein failure to meet the misuse event requirement for detecting that the current location coordinates indicate that the system has not been moved from an authorized location results in a denial of supply of electrical power by the regulator; and wherein the at least one second authorization rule is a purchase requirement, wherein the purchase requirement is at least one of: a pre-provision purchase requirement and a post-provision purchase requirement.